CTA Kimball, Princeton and State Substation Rehabilitation, Chicago, IL
Construction Management of Traction Power Substation
Design of the CTA substation at Kimball, Princeton and State Street- Responsibilities include review and approval of the design drawings, and product submittals, including DC switchgear, transformers, rectifiers and AC switchgear, relay and control logic, substation lighting and power distribution.
Additional responsibilities included responding to RFI’s, integrating all equipment installed by the Contractor; factory and field witness testing of all the equipment and systems installed.
Project Details
KEY PERSONNEL
Sunish Mathew, P.E.*
Oren Skidelsky, P.E.*
AGENCY/OWNER
Chicago Transit Authority (CTA)
PROJECT TYPE
System Engineering
PROJECT DURATION
2014-2015