Project Description
CTA Redline Dan Ryan Track Renewal, Chicago, IL
Design/Construction Engineering
Replacing 10 mile stretch of track and traction power systems – Responsible for design review and overseeing construction for the traction power system.
Construction Responsibilities include review and response to RFI’s, Shop Drawing Reviews, Cost Estimate Reviews, Change Order Reviews and testing and Installation Oversight.
Project Details
KEY PERSONNEL
Sunish Mathew, P.E.*
AGENCY/OWNER
Chicago Transit Authority (CTA)
PROJECT TYPE
Traction Power/Design & Construction Engineering
PROJECT DURATION
Design: 07/2012-04/2013
Construction: 05/2013-10/2013
*The listed personnel had a key role in completing this project prior to joining Facet team.