Project Description
O’Hare Car Rental Facility and Airport Transit System Station, Chicago, IL
Design / Construction Management & Administration
Electrical redesign for the contractor (assisting the electrical designer on the project) and ATS Station. Responsibilities during Design Phase included verifying the design, redesigning the electrical single line, panel schedule and feeder sizing.
Responsibilities during Construction Phase include monitoring the daily activity, documentation and inspection to verify proper installation, assembling shop drawings and writing RFIs.
ts.
Project Details
KEY PERSONNEL
Oren Skidelsky, P.E.*
Boris Gorelik, P.E.*
AGENCY/OWNER
O’Hare International Airport
PROJECT TYPE
Electrical Engineering Design, Construction Management and Administration
PROJECT DURATION
2015-2016
*The listed personnel had a key role in completing this project prior to joining Facet team.